Utility-Scale Solar | C-Part Contractor
Pabna Solar Project
64 MW AC / 84 MWp DC • BCRECL • Commissioned 2025
Representative image of comparable SEDCOL site works — not a photograph of this project. Project photography to be supplied.
Location
Pabna, Bangladesh
Capacity
64 MW AC / 84 MWp DC
Client / Project Company
BCRECL
Main EPC / SEDCOL Role
CMC / C-Part Contractor
SEDCOL scope of works
-
01
Site mobilization and preparation
-
02
Earthwork, excavation and cable trenching
-
03
Piling, foundations and mounting structures
-
04
Solar-module installation
-
05
DC and AC cabling works
-
06
Construction supervision and quality inspection
Project at a glance
Installed capacity
84 MWp DC
Client
BCRECL
Main EPC
CMC
Commissioned
2025
Role claritySEDCOL served as the C-Part Contractor, responsible for the defined local construction scope under CMC as Main EPC. This page does not represent SEDCOL as the full-project EPC contractor.