Aerial view of a utility-scale solar photovoltaic plant beside a river in rural Bangladesh
Solar EPC • Construction • O&M • Bangladesh

Engineering Bangladesh’s renewable energy future

Solar construction, installation, testing, commissioning and long-term operation & maintenance — from utility-scale plants to industrial rooftops.

300+MWp
Project Participation
Solar PV projects in Bangladesh
100+MWp
Rooftop Solar
Grid-connected rooftop systems
150+MWp
Under Active O&M
Portfolio under active management
8
Field Teams
Deployed nationwide across Bangladesh

Figures represent project participation and portfolio under management according to company records — not sole-contractor delivered capacity.

Who we are

Built on experience. Driven by the future.

SEDCOL is the Bangladesh operating entity of the SOLARLAND® international renewable-energy brand. Established in Bangladesh in 2011, we combine global solar technology experience with local engineering, construction and lifecycle-service capability.

From equipment supply and after-sales support, SEDCOL has evolved into a multidisciplinary project-delivery company supporting grid-connected rooftop and utility-scale solar projects — from site survey and engineering coordination through civil and electrical construction, installation, testing, commissioning and long-term operation & maintenance.

Elevated solar array over open ground at a grid-connected plant in Bangladesh
1 MW+
Battery Energy Storage
Integrated storage experience
15+
Awards & Recognition
SEDCOL and Solarland brand
200+
Solar Pumps Installed
Field-proven deployment
6
Mini-Grid Projects
1 MWp+ combined solar capacity
Capabilities

Integrated capability. One delivery partner.

Engineering, construction and operational expertise across the complete solar-project lifecycle — from utility-scale plants to rooftops, storage and distributed-energy systems.

01

Utility-Scale Solar

MW-scale ground-mounted plants delivered under EPC partnership and C-Part construction structures.

  • MW-scale ground-mounted plants
  • EPC partnership and C-Part construction
  • Balance-of-system engineering and installation
02

Industrial & Commercial Rooftop

Rooftop EPC for industrial facilities, from 100 kWp to 3.6 MW+, with and without net metering.

  • Rooftop EPC for industrial facilities
  • Grid-tied systems with and without net metering
  • Projects from 100 kWp to 3.6 MW+
03

Civil, Mechanical & Electrical

Integrated construction execution from earthwork and foundations through to substation installation.

  • Earthwork, piling and foundations
  • Mounting structures, DC/AC cabling
  • Inverter, transformer and substation installation
04

Testing, Commissioning & Handover

System testing, grid-interface coordination and structured documentation handover.

  • System testing and fault diagnosis
  • Commissioning support and grid-interface coordination
  • Documentation and handover
  • 1Assess
  • 2Engineer
  • 3Build
  • 4Energize
  • 5Operate
Project portfolio

Proven across scale and applications

Selected experience across utility-scale solar, industrial rooftops, O&M, energy storage and distributed-energy infrastructure in Bangladesh.

Ground-mounted solar array at a grid-connected solar power plant in Bangladesh C-Part Contractor Representative image

Utility-Scale Solar

Sirajganj Solar Project

68 MW AC / 85 MWp DC

Client:
BCRECL
Main EPC:
CMC
Location:
Sirajganj, Bangladesh
Commissioned 2024 View project
Rows of ground-mounted solar modules at a utility-scale solar plant in Bangladesh C-Part Contractor Representative image

Utility-Scale Solar

Pabna Solar Project

64 MW AC / 84 MWp DC

Client:
BCRECL
Main EPC:
CMC
Location:
Pabna, Bangladesh
Commissioned 2025 View project
Aerial view of a 50 MW grid-connected solar power plant beside a river in Bangladesh C-Part Contractor

Utility-Scale Solar

Mymensingh Solar Park

50 MW AC / 73.8 MWp DC

Client:
HDFC Sinpower Ltd.
Main EPC:
Fujian Yongfu
Location:
Sutiakhali, Gauripur, Mymensingh, Bangladesh
Grid-Connected 2020 View project
Aerial view of a utility-scale solar power plant and its substation in Bangladesh EPC Partner Representative image

Utility-Scale Solar

Teknaf Solar Park

20 MW AC / 28 MWp DC

Client:
Technaf Solartech Energy Ltd. (TSEL)
Location:
Alikhali, South Nhila, Teknaf, Cox’s Bazar
Commercial Operation 2018 View project
Grid-tied solar modules installed across an industrial rooftop in Bangladesh EPC Partner Representative image

Industrial Rooftop Solar

Meghnaghat Industrial Rooftop Solar

22.69 MWp DC

Client:
SSEL — Meghna Group of Industries
Location:
Meghnaghat, Sonargaon, Narayanganj, Bangladesh
Completed 2023 View project

C-Part Contractor means local civil, mechanical and electrical construction under a separate Main EPC. 'EPC Partner' is used only where supported by project records.

Why SEDCOL

Bangladesh execution depth. International EPC discipline.

A proven local delivery partner for complex solar, storage and distributed-energy projects.

1

Proven Project Scale

Participation in utility-scale solar projects from 7.6 MW to 68 MW, supported by more than 100 MWp of rooftop experience.

2

Construction & Commissioning Depth

Local civil, mechanical and electrical execution — from foundations and mounting structures to installation, testing and commissioning.

3

International EPC Coordination

Experience working alongside CMC, Fujian Yongfu and PowerChina, with international documentation, quality and HSE discipline.

4

Multi-Segment Energy Capability

Utility solar • Rooftop • BESS • Mini-grid • Solar irrigation • Street lighting • Carbon-market support

5

Quality, Safety & Lifecycle Reliability

ISO 9001:2015 • ISO 14001:2015 • ISO 45001:2018 • Nationwide O&M field response

Quality, HSE & governance

Controlled delivery. Verifiable assurance.

A documented management framework designed to protect people, quality, schedule, cost and long-term asset performance — certified to three international standards.

  • Approved method statements before construction begins
  • Documented inspection and test plans for every project phase
  • Site-specific HSE plans, mandatory PPE and daily toolbox meetings
  • Traceable records, as-built documentation and structured handover

ISO 9001:2015

Quality Management System

Valid until 13 November 2026 • ASCB Global

ISO 14001:2015

Environmental Management System

Valid until 16 March 2028 • Euro Universal Accreditation Systems (EUAS)

ISO 45001:2018

Occupational Health & Safety Management System

Valid until 16 March 2028 • Euro Universal Accreditation Systems (EUAS)

Certification details and validity dates shown according to the provided company records.

Beyond utility-scale

Complementary project experience

Mini-Grids

4 projects • 825+ kWp combined capacity • SolarElectro and AVA

Irrigation

Solar low-lift and drip irrigation • BADC • Bandarban and Rangamati

Public Infrastructure

Solar street lighting • Dhaka EPZ • Chattogram EPZ • BEPZA Economic Zone, Mirsarai

Lifecycle Services

150+ MWp under O&M • 8 field teams • Monitoring, maintenance and reporting

Our journey

Two decades of progress

From a Wuxi production line in 2003 to utility-scale project delivery across Bangladesh — the Solarland brand and SEDCOL in one timeline.

Solarland Group Bangladesh
  1. 2003

    Solarland founded

    • Founded in Wuxi, China and the SOLARLAND brand registered
    • First production line commissioned in Xishan District, Wuxi
  2. 2004

    First production base

    • First production base opened in Wuxi New District, 2,700 m²
  3. 2006

    Second production base

    • Second base opened in Wuxi Airport Industrial Park, 6,000 m²
  4. 2008

    Solarland Bangladesh founded

    • Solarland Bangladesh established in Dhaka
    • Solarland Germany established in Kaiserslautern
  5. 2009

    Global expansion

    • Solarland USA founded with a warehouse in Southern California
    • Solarland Malaysia founded in Kuala Lumpur
    • Solarland Kenya founded as a joint venture with SMART
  6. 2010

    Market leadership in Bangladesh

    • IDCOL approval and development-finance support
    • Approximately 30% market share reported
    • Solarland Turkey founded in Istanbul
  7. 2011

    SEDCOL established

    • Solarland Engineering & Development Co., Ltd. established in Bangladesh
    • Solarland (Wuxi) Electric Science and Technology Co., Ltd. founded with US$15 million registered capital
  8. 2012

    Complete project solutions

    • Expanded from equipment supply into complete project solutions
    • Solarland named among Wuxi's first low-carbon pilot enterprises
  9. 2013

    Headquarters established

    • Headquarters and production base foundation laid across 32,000 m²
  10. 2014

    First MW-scale PV plant

    • 3.3 MW Wuxi Weike distributed PV station developed with CMEC Renewable Energy
  11. 2015

    Automated manufacturing

    • Headquarters and first automatic production line in operation
    • ISO 9001 quality management certification obtained
  12. 2016

    Rooftop solar and O&M

    • Entry into grid-connected rooftop solar and O&M in Bangladesh
    • Second fully automatic production line commissioned
    • TUV Rheinland certification obtained
  13. 2018

    Teknaf Solar Park

    • Bangladesh's first utility-scale solar park — 20 MW AC / 28 MWp DC
    • Solarland named an Authorized O&M Partner by Growatt
  14. 2020

    Mymensingh & Sirajganj

    • Mymensingh Solar Park grid-connected — 50 MW AC / 73.8 MWp DC
    • Sirajganj 7.6 MW grid-connected solar photovoltaic power plant
  15. 2021

    Public infrastructure

    • BEPZA Economic Zone solar street lighting contract awarded
    • NWPGCL Sirajganj Solar Park operational
    • Three Bangladesh Solar Week Leadership Awards
  16. 2023

    Meghnaghat rooftop

    • 22.69 MWp industrial rooftop completed for Meghna Group of Industries
  17. 2024

    Sirajganj Solar Project

    • 68 MW AC / 85 MWp DC delivered for BCRECL as C-Part Contractor
  18. 2025

    Pabna Solar Project

    • 64 MW AC / 84 MWp DC commissioned for BCRECL as C-Part Contractor
  19. 2026

    Storage and rooftop

    • NWPGCL 1.7 MW rooftop solar
    • 20 kWp solar with 100 kWh battery energy storage

Entries marked “Solarland Group” describe the international brand and its manufacturing operations. Entries marked “Bangladesh” describe SEDCOL. Group entries are presented according to Solarland Group published records; Bangladesh entries according to SEDCOL company records.

Ready to deliver your next energy project

Let’s build a cleaner energy future

From complex construction and commissioning to long-term asset performance, SEDCOL is ready to support your next renewable-energy project.

  • Utility Solar
  • Rooftop
  • BESS
  • Distributed Energy